Reactor
D-D Fluidised Reactor
Used with aqua Marin bio balls
Installed on August 17, 2014
Lighting
2 Heater 400w
One used as main temp control, second used as a back up or if temp drops 4 degrees lower than set. Both controlled by Apex system
Installed on August 17, 2014
UV
TMC Vecton
300
Installed on April 20, 2013
Skimmer
Bubble Magus Curve 5
Installed on April 20, 2013
Lighting
Maxspect Mazarra
2x P series modules
Installed on April 20, 2013
Other
2 Neptune Apex I/O Breakout Box
Installed on April 20, 2013
Controller
Neptune Apex Controller
Installed on April 20, 2013